STRUCTURE REVIEW LETTER · TARGET LANGUAGE
Independent verification body
We reviewed the CBAMValid Preparation Pack structure. It contains the data fields and evidence lineage required under IR 2025/2621 for our verification workflow. This is a structural review, not a verification opinion.
